Trenchless work disturbs much less ground than a full trench, but the crew still needs room for pits, equipment, and materials. A little preparation helps the work start on time and protects things you care about.
FIELD NOTE
Clear The Work Areas
Ask where the pits are planned and move vehicles, planters, furniture, and stored items away from those spots and the path to them. If the receiving pit is near a driveway, plan where cars will park during the work.
Tell the crew about plants, pavers, or features you want protected or set aside. Some items near a pit may need to be moved before digging.
FIELD NOTE
Point Out What Is Underground
Public utilities are marked through DigAlert (811) before digging, but private lines often are not. Mention irrigation lines, landscape lighting, gas lines to outdoor appliances, or any buried cables you know about.
If you have property plans or know where the sewer line exits the house, share them. Do not open cleanouts or dig to find the line yourself.
FIELD NOTE
During And After The Work
Keep children and pets away from open pits and equipment. Expect a pause in using fixtures that drain into the sewer while the old line is disconnected and the new one is connected.
Ask what restoration of the pit areas is included and what is separate. Walk the site with the crew at the end so you know what was done and what, if anything, still needs attention.